The duty manager’s first half hour sets up the whole day. Before anyone else needs an answer, it is worth knowing three things: is the building as it should be, what was left open yesterday, and is today’s team in place.
This checklist walks through exactly that. It starts with the building, moves on to last night’s handover and the open issues that came with it, and ends with today: who is in, what is booked and whether the tills are ready. The kitchen and bar have their own opening checks; this one is the manager’s overview.
The checklist
- The buildingWalk in through the back as well as the front.
- Any sign of damage or a break-in overnight? Yes NoYes means a problem
- If “Any sign of damage or a break-in overnight?” is Yes:What happened, and who has been told?
- Fire exits clear and unlocked Yes NoNo means a problem
- Lights, heating and extraction on
- Yesterday
- Last night’s handover read
- Open issues reviewed, each with an owner
- Today
- Is everyone in who should be? Yes NoNo means a problem
- If “Is everyone in who should be?” is No:Who is missing, and how is it covered?
- Bookings and expected covers checked
- Floats counted and tills ready
- Anything the team should know
This is the same template OpenHandover teams start from. Edit it to match your own procedures.
Getting it right
- Walk in through the back door as well as the front. Problems overnight usually show at the back first.
- Read the handover before you brief anyone. The open issues are the first things to give owners to.
- If someone is missing, write down how the gap is covered, so the briefing and the handover say the same thing.
Using it in OpenHandover
In OpenHandover the manager’s opening check sits alongside each department’s own checks on Today, so you can see at a glance which openings are done. Last night’s handover and every open issue are a tap away.